The Competency – Based Programme (Accreditation Programme) are driven by the ACT520 Akta Lembaga Pembangunan Industri Pembinaan Malaysia (Pindaan 2011) …

    • MODULE 01 – FUNDAMENTALS OF CONSTRUCTION MANAGEMENT COMPETENCIES Unlimited
    • 1.1 INTRODUCTION FUNDAMENTALS OF CONSTRUCTION MANAGEMENT COMPETENCY 00:00:00
    • 1.2 CHARACTERISTICS OF CONSTRUCTION PROJECTS 00:00:00
    • 1.3 PROJECT LIFE CYCLE, PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT 00:00:00
    • 1.4 CONSTRUCTION MANAGEMENT DUTIES AND TASKS 00:00:00
    • 1.5 CONSTRUCTION MANAGEMENT COMPETENCIES 00:00:00
    • 1.6 PEOPLE MANAGEMENT COMPETENCY 00:00:00
    • CCM QUIZ M01 00:06:00
    • Knowledge Assessment (KA) CCM M01 00:25:00
    • MODULE-02-TENDERING-MANAGEMENT Unlimited
    • 2.1 INTRODUCTION TENDERING MANAGEMENT 00:00:00
    • 2.2 ANALYSE TENDER TABLE DOUCUMENT (TTD) 00:00:00
    • 2.3 EVALUATE CAPABILITY TO TENDER 00:00:00
    • 2.4 PRICE AND SUBMIT TENDER 00:00:00
    • CCM QUIZ M02 00:06:00
    • Knowledge Assessment (KA) CCM M02 00:25:00
    • MODULE-03-SITE-MOBILISATION-MANAGEMENT Unlimited
    • 3.1 SITE MOBILISATION MANAGEMENT 00:00:00
    • CCM QUIZ M03 00:06:00
    • Knowledge Assessment (KA) CCM M03 00:25:00
    • MODULE-04-CONSTRUCTION-PLANNING-AND-IMPLEMENTATION Unlimited
    • 4.1 INTRODUCTION CONSTRUCTION PLANNING AND IMPLEMENTATION 00:00:00
    • 4.2 PLANNING AND IMPLEMENTATION 00:00:00
    • CCM QUIZ M04 00:06:00
    • Knowledge Assessment (KA) CCM M04 00:25:00
    • MODULE 05 – CASH FLOW MANAGEMENT Unlimited
    • 5.1 CASH FLOW MANAGEMENT 00:00:00
    • 5.2 CASH FLOW FORECAST 00:00:00
    • 5.3 ESTABLISH THE CASHFLOW MANAGEMENT AND CONTROL PROCESS 00:00:00
    • 5.4 COMMUNICATE PROJECT CASH FLOW 00:00:00
    • 5.5 MONITOR AND CONTROL PROJECT CASH FLOW PERFORMANCE 00:00:00
    • CCM QUIZ M05 00:06:00
    • Knowledge Assessment (KA) CCM M05 00:25:00
    • 6.1 CONSTRUCTION QUALITY MANAGEMENT 00:00:00
    • 6.2 THIRD PARTY QUALITY AUDITS 00:00:00
    • 6.3 COMMUNICATE THE PROJECT QUALITY MANAGEMENT PROCESS TO PROJECT TEAM 00:00:00
    • 6.4 MONITOR AND CONTROL QUALITY COMPLIANCE 00:00:00
    • 6.5 ESTABLISH WORKING ENVIRONMENT FOR MANAGING QUALITY 00:00:00
    • 6.6 CONSTRUCTION SAFETY AND HEALTH MANAGEMENT 00:00:00
    • 6.7 ESTABLISH SAFETY AND HEALTH MANAGEMENT PLAN 00:00:00
    • 6.8 ORGANISE SAFETY AND HEALTH IMPLEMENTATION 00:00:00
    • 6.9 COMMUNICATE PROJECT SAFETY AND HEALTH MANAGEMENT PLAN IMPLEMENTATION PROCESS TO PROJECT TEAM 00:00:00
    • 6.10 MONITOR AND CONTROL SAFETY AND HEALTH COMPLIANCE 00:00:00
    • 6.11 CREATE POSITIVE WORKING ENVIRONMENT FOR MANAGING SAFETY AND HEALTH 00:00:00
    • CCM – E QUIZ M06 00:06:00
    • Knowledge Assessment (KA) CCM (ELECTRICAL & MECHANICAL) M06 00:25:00
    • 7.1 AIR CONDITIONING & VENTILATION TECHNOLOGY 00:00:00
    • 7.2 AIR-CONDITIONING AND VENTILATION TECHNOLOGY 00:00:00
    • 7.3 DESIGN AND WORKFLOW OF THE AIR-CONDITIONING AND HVAC SYSTEM 00:00:00
    • 7.4 MONITORING OF WORK PROCESS INSTALLATION OF AIR-CONDITIONING AND HVAC SYSTEM 00:00:00
    • 7.5 AIR-CONDITIONING AND HVAC SYSTEM INSTALLATION Unlimited
    • 7.6 TESTING AND COMMISSIONING OF INSTALLATION SYSTEM Unlimited
    • CCM – M QUIZ M07 00:06:00
    • Knowledge Assessment (KA) CCM (MECHANICAL) M07 00:25:00
    • 8.1 FIRE PROTECTION SYSTEM TECHNOLOGY 00:00:00
    • 8.2 FIRE PROTECTION SYSTEM TECHNOLOGY 00:00:00
    • 8.3 DESIGN AND WORKFLOW OF THE FIRE PROTECTION SYSTEM TECHNOLOGY 00:00:00
    • 8.4 MONITORING OF WORK PROCESS INSTALLATION OF FIRE PROTECTION SYSTEM TECHNOLOGY 00:00:00
    • 8.5 FIRE PROTECTION SYSTEM INSTALLATION 00:00:00
    • 8.6 TESTING AND COMMISSIONING OF INSTALLATION SYSTEM 00:00:00
    • CCM – M QUIZ M08 00:06:00
    • Knowledge Assessment (KA) CCM (MECHANICAL) M08 00:25:00
    • 9.1 WATER SUPPLY AND SANITARY TECHNOLOGY 00:00:00
    • 9.2 WATER SUPPLY AND SANITARY SYSTEM TECHNOLOGY 00:00:00
    • 9.3 DESIGN AND WORKFLOW OF THE WATER SUPPLY AND SANITARY SYSTEM TECHNOLOGY 00:00:00
    • 9.4 MONITORING OF WORK PROCESS INSTALLATION OF WATER SUPPLY AND SANITARY SYSTEM TECHNOLOGY 00:00:00
    • 9.5 WATER SUPPLY AND SANITARY SYSTEM INSTALLATION 00:00:00
    • 9.6 TESTING AND COMMISSIONING OF INSTALLATION SYSTEM 00:00:00
    • CCM – M QUIZ M09 00:06:00
    • Knowledge Assessment (KA) CCM (MECHANICAL) M09 00:25:00
    • 10.1 TRANSPORTATION SYSTEM IN BUILDING TECHNOLOGY 00:00:00
    • 10.2 TRANSPORTATION IN BUILDING 00:00:00
    • CCM – M QUIZ M10 00:06:00
    • Knowledge Assessment (KA) CCM (MECHANICAL) M10 00:25:00
    • 11.1 KITCHEN EQUIPMENT’S AND LPG 00:00:00
    • 11.2 COMPRESSED AIR SYSTEM SPECIAL MECHANICAL SERVICES 00:00:00
    • CCM – M QUIZ M11 00:06:00
    • Knowledge Assessment (KA) CCM (MECHANICAL) M11 00:25:00
    • 12.1 RAILWAY ENGINEERING 00:00:00
    • 12.2 AIRPORT AND SEAPORT 00:00:00
    • 12.3 ENERGY AND WATER RESOURCES 00:00:00
    • CCM – M QUIZ M12 00:06:00
    • Knowledge Assessment (KA) CCM (MECHANICAL) M12 00:25:00
    • 13.1 ORGANISE MATERIALS MANAGEMENT PROCESS AND COMMUNICATE MATERIALS MANAGEMENT MONITORING AND CONTROL PROCEDURES 00:00:00
    • 13.2 PLAN LABOUR REQUIREMENT AND REQUISITION 00:00:00
    • 13.3 PLAN PLANT AND MACHINERIES REQUIREMENT 00:00:00
    • CCM – EM QUIZ M13 00:06:00
    • Knowledge Assessment (KA) CCM (ELECTRICAL & MECHANICAL) M13 00:25:00
    • MODULE-14-CONTRACT AND STAKEHOLDER MANAGEMENT Unlimited
    • MODULE-14-STAKEHOLDER-MANAGEMENT Unlimited
    • 14.1 CONTRACT ADMINISTRATION 00:00:00
    • 14.2 ELEMENTS OF CONSTRUCTION CONTRACTS 00:00:00
    • 14.3 ESTABLISH POSITIVE WORKING ENVIRONMENT FOR ASSISTING THE MANAGEMENT OF CONSTRUCTION CONTRACTS 00:00:00
    • 14.4 STAKEHOLDER MANAGEMENT 00:00:00
    • 14.5 STAKEHOLDER MANAGEMENT PROCESS 00:00:00
    • 14.6 ORGANISE THE PROJECT STAKEHOLDER MANAGEMENT PROCESS 00:00:00
    • 14.7 COMMUNICATING THE PROJECT STAKEHOLDER MANAGEMENT PROCESS TO PROJECT TEAM 00:00:00
    • 14.8 MONITORING AND CONTROLLING THE QUALITY COMPLIANCE 00:00:00
    • 14.9 ESTABLISHING POSITIVE WORKING ENVIRONMENT FOR MANAGING QUALITY 00:00:00
    • CCM QUIZ M14 00:06:00
    • Knowledge Assessment (KA) CCM M14 00:25:00
    • 15.1 PROFESSIONAL ETHICS AND ENTREPRENEURSHIP 00:00:00
    • CCM QUIZ M15 00:06:00
    • 16.1 TESTING AND COMMISSIONING MANAGEMENT 00:00:00
    • CCM – E QUIZ M16 00:06:00
    • Knowledge Assessment (KA) CCM (ELECTRICAL & MECHANICAL) M16 00:25:00
    • MODULE-17-PROJECT-HANDING-OVER-MANAGEMENT Unlimited
    • 17.1 PROJECT HANDOVER MANAGEMENT 00:00:00
    • 17.2 MANAGING THE DEFECTS LIABILITY PERIOD (DLP) 00:00:00
    • 17.3 MANAGING FINAL ACCOUNT 00:00:00
    • 17.4 CREATING POSITIVE WORKING ENVIRONMENT FOR SUCCESSFUL OF PROJECT HANDOVER 00:00:00
    • CCM QUIZ M17 00:06:00
    • Knowledge Assessment (KA) CCM M17 00:25:00
error: Content is protected !!